The Easy Way To Install Solar Panels

· Solar Panels
broken image

Solar Panel Installation is not as easy as some people think it is. You really need to know what you are doing if you want to get it right the first time. There are some pitfalls to messing things up for yourself or to have your equipment come to waste because of a simple mistake in planning or installation. Here's a simple checklist to help you along your solar panel installation and get it right the first time:
 

How to install Solar Panels Step by Step - Solar Panel Installation Process Overview This is the first thing that is needed when setting up any new electrical system and this is even more important when going solar panel installation for your home. This is the first step in the installation process and if not followed properly, things could really go south for you and the cost of the entire installation could skyrocket. This article is going to cover the basic installation process and then I will talk about interconnecting and connecting wires. After that, documentation will need to be obtained and an installer must also be involved. Go to this link https://blueravensolar.com/blog/are-solar-panels-worth-it/ to acquire more info.
 

How to Install Solar Panels - Interconnecting the Pieces Part 1 Remember that there are different parts that make up the solar panel installation and each has to be installed properly to keep the overall system going right. It doesn't matter how you get them connected (be it manual or electrician-instructed), but it is imperative that they are. In order to make the entire thing work, it is going to be important to hire a professional installer and have them inspect everything once the wiring connections are made and everything is connected. An electrician-instructed installation should follow these instructions closely.
 

Where to Find the Site Visit - Roof and Ground Conditions A ground-only system size will require less building materials and will cost less in total. If the site is flat, with minimal trees on either side and is close to the sun, this would be the way to go. However, most people are building a system where the roof is at least part shaded and has limited trees on either side and close to the main building. For this reason, the installation will be slightly more expensive and more time consuming. If your roof is angled towards the sun, it would be best to have the installer install the shingles first and then put all the panels on top of them.
 

Installing the Components Once the site visit has been completed, the actual installation can begin. First off, the engineer will need to take measurements and note all the utilities and lighting that are available to the property. There will also be electrical, plumbing and ventilation considerations. Once these are taken care of, the installer can then prepare the construction site for the installation of the kw solar energy system by gathering all the necessary materials.
 

On the day of the installation process, the installer will meet up with the homeowner and start the process of setting up. The home owner will sign some papers which will allow the installer to place the solar panels and other things on the property. At this point, the installer will gather the power and then connect all of the electrical components. Finally, the installer will test everything and reconnect the main power. All in all, the entire installation process is quite simple. If you are in need of solar panel installation, get in touch with Blue Raven Solar!

To get more info, check out this link: https://en.wikipedia.org/wiki/Solar_panel